Header Ads Widget

Ticker

6/recent/ticker-posts

Board progress 3

Another update. Two of the boards are now covered with grass mat and I've begun excavation on the river. Banks need to be lowered a bit more and I'm really bored (no pun intended!) with digging. About a third to go on the other board.

Either side of the river will get "matted" as well, but I want to get the main construction done first.

Yorum Gönder

0 Yorumlar